PDA Member Projects

Taiwan Stock Exchange Data Processing Center


  • 5/1/2015

Project Description

Project Description

The Taiwan Stock Exchange has the largest car parking area in Taiwan.  Polyurea was used to coat the parking area, parking area ramps, as well as the roof.

Paticipants:
Designer : LAI & ASSOCIATES ENGINEERS-ARCHITECTS 
PCM : Sinotech Engineering Consultants Ltd. 
Main Contractor : SANSIN BUILDERS CO., LTD. 
Specialist Contractor : Brighten Engineering Co., Ltd. 
Material supplyer : HUNTSMAN, USA

SPRAY AREA SPECS:
12,245 m2 
Car park floor area : 9,003 m2 
Ramp area : 816 m2 
Roof area : 2,426 m2 

CURRENT SITUATION : 
•    Completed  April 30, 2015 

PROJECT PROCEDURE:
•    Concrete surface was ground and polished to ensure level requirement
•    Industrial vacuum cleaner was used to pick up dust and debris
•    Primers were checked by engineers and two coats were applied
•     Coat of polyurea was then applied 
•    Foundation blocks were also sprayed with polyurea coating
•    Engineers then inspected the coating of polyurea

SITE CHALLENGES & UNFORSEEN ISSUES:
•    Due to the amount of area being sprayed with polyurea including the ramp area, there was a lot of attention drawn to this project
•    This was the first time Brighten Engineering and Huntsman Taiwan had encountered applying polyurea to a car ramp area.


Client:
Taiwan Stock Exchange

  • Client:

    Taiwan Stock Exchange